Paul sets the second of two rebar pins, one for each of two columns that will sit on this footer. |
|
With a small air compressor, we blew the concrete dust out of each hole to make sure the pins sat all the way down in them. |
That's Paul up on the wall, doing some trimming on the butt end of the first log on course #5. |
|
After we got the butt end plumbed, Paul drilled two holes and drove two rebar pins in to hold it in place. |
Jillena and Stephen strolled out again today to visit. |
|
Around quitting time, we had one log up and partially pinned on the fifth course. |