A rear-mounted crane on the back of the form truck begins lifting off the steel form bundles for the walls. |
|
Before the forms for the walls can go up, the wooden footer forms get taken off. |
Another form bundle comes off the truck. |
|
The bundles got placed around the perimeter. |
The rebar for the walls gets laid out on the ground first before attaching to the footer rebar pins. |
|
The stone slinger backing into position to spread more crushed stone inside the perimeter of the house. |
Fastening the rebar for the rear footers to the rebar pins in the double frost wall. |
|
The guy in the red hat operated every movement of the stone slinger by wireless remote control, including the truck itself! |
Workers spread the stone so that it comes up level with the top of the footers. |
|
Installing the forms for the footers on the double frost wall which will support the rear patio concrete slab. |
Working on the front of the two slab footers. |
|
All ready to pour concrete in these forms. |