A couple of the 6x6's along the east side stuck up too high above the decking, so we ground them down with the chainsaw first... |
|
...then leveled the tops with a belt sander. |
Oliver and Jillena supervising. |
|
The horizontal tie beams are doubled 2x10's. For the first pair, we scribed the first one, then traced its profile to the second one. The tracing proved not to be accurate enough so we ended up scribing each board. |