| Here's the first log "we" set. After drying out for 5 years, lifting a 7-foot log was a "piece of cake". (Bob volunteered to lift the post  while Jeff guided the base with the pre-drilled hole onto the pin.) |  | For each post location, we first drilled a 1/2" hole down into the 6x6, making sure it was a plumb as possible. | 
          
            | Each hole is about 8" deep. |  | Jeff tapping in a rebar pin. | 
          
            | For those 6x6 posts that didn't quite poke up past the deck surface, we cut square pressure-treated shims so the log supports would not sit directly on the decking. |  | Here you can see the first log support set at the far corner, and the rebar pins in the rest of the 6x6's. | 
          
            | We then selected the log sections we wanted along the front of the house and set them on the deck at each pin location. |  | Before lifting the log support onto the pin, Jeff and Stephen brushed  a waterproof stain onto the bottom end grain. |