Each board that met the log wall had to be scribed for a tight fit. |
|
Our work area in the living room. |
While Jeff kept busy scribing the wall ends of floor boards, Jillena and Paul stayed ahead of him with the nailing. |
|
Jillena relaxing after finishing the flooring in the kitchen. |
Cutting the scribe for the RPSL in the dining room. |
|
Dry fit. |
All but one board left to finish off the pole, and one row to finish off the south half of the house. |
|
After the rest of the boards that were already in the living room were moved to the dining room, we brought in and stacked the remaining boards that were out on the truck. |