LOG MILLING
12-13-10
 
 
We've got lots of lumber to work with and most of it is in piles on the 1st floor.
All the lumber is stickered to minimize warping.
     
We've got everything from 1/2" siding to the 6x8 beams. There's not much room for working right now, but once we can bring some scaffolding back inside, we'll put a lot of the 1/2" material up on the gable walls.
Our temporary front door.
<-- BACK TO "Fall 2010 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s