With a water pail hanging from a rung, Jeff used a wet Scotch Brite pad to clean the mortar slag off the logs. |
|
On the front wall scaffolding, Bob was cutting and fitting beveled foam board pieces between the logs. |
Jillena took this shot from the bathroom window. |
|
Here's the completed back wall after Jeff finished cleaning the logs. |
All the scaffolding is now set up on the front wall, with a 3rd level in the middle for working on the gable section. |
|
Jillena was hard at work sprayfoaming around the blue foam board from the inside wherever she could see daylight. |
Switching to indoor evening work - cutting lath strips. |
|
Jeff cut quite a bit of lath, hoping that, along with what Bob had been cutting at home, we had enough to do the entire front wall. We ended up having so much that used about half of what the guys cut. No worries. There's still the inside to mortar. |