EXTERIOR STAINING & CHINKING
10-8-10
 
 
The single tower was manageable for Bob to roll along the wall on the concrete patio. He defuzzed the entire wall as high as he could reach. Only the top 4 courses were left.
Jeff and Mike worked their way down on the front wall with the top coat of stain.
<-- BACK TO "Fall 2010 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s