EXTERIOR STAINING & CHINKING
9-24-10
 
 
Last night, Jeff spread some recently-delivered topsoil near the house and tracked it down to provide a stable base for the scaffolding.
Bob and Jeff laid out the base planks and got right to setting up the lower tower sections.
     
   
Before long, we had both decks built and Bob and Jillena started defuzzing. By this time, Jeff had the front door opening cut.
 
<-- BACK TO "Fall 2010 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s