After carving another two inches or so into the header log, the header board was put into place.
Lag bolt locations were then pre-drilled...
     
...then the lag bolts inserted and tightened down.
The window frame is set, shimmed, and screwed in.
 
 
A look at the frame all secured. Also shown is the ratchet strap Jeff used to keep the frame from accidentally tipping out of the opening.
Jamb liners are back in.
     
 
With the sashes in, our bathroom window is finished.
Lastly, Jeff stuffed insulation around the frame and around the casing - wherever there was a gap.