After carving another two inches or so into the header log, the header board was put into place. |
|
Lag bolt locations were then pre-drilled... |
...then the lag bolts inserted and tightened down. |
|
The window frame is set, shimmed, and screwed in. |
A look at the frame all secured. Also shown is the ratchet strap Jeff used to keep the frame from accidentally tipping out of the opening. |
|
Jamb liners are back in. |
With the sashes in, our bathroom window is finished. |
|
Lastly, Jeff stuffed insulation around the frame and around the casing - wherever there was a gap. |