As soon as Paul arrived, we got right to work on tamping the stone. Here, Jillena is raking the stone while Paul runs the plate tamper. |
|
A bit later, Jeff was back to pressure-washing and Paul was up at the peak taking measurements for the north end piece of the ridge cap. |
To reach the top logs, Jeff had to get himself up under the east roof overhang. |
|
Paul dry-fits the end cap to make sure there's enough overlap when we tuck this piece under the existing cap. |
Cutting the end piece to length. |
|
Later in the evening, Jeff and Paul went back to work on the floor. With more string lines tied up at head level, we used a concrete hoe with a long handle as our measuring stick. |