9-7-09
 
 
The drain tile pipe has been completely lowered and re-buried. This pic shows the progress of the remaining stone removal.
Aaron, Keith and LouElla worked hard at removing enough stone so that the grade is 2" below top of footer.
     
 
Jillena installing the foam strip under one of the lower panels.
By mid afternoon, we were just about finished with the east half. Since Tim and LouElla went up to join Paul after lunch, we had three people working on the roof. As we neared the end, two was much safer.
     
 
All of the stone being removed from the basement is just getting piled up outside the doorway for now. It will all get used somewhere else eventually.
Fred manned the brush fire, keeping it fed throughout the afternoon.
     
 
Aaron and LouElla work on the last section of drain tile pipe under the doorway.
Jeff on the excavator, digging a ditch across the driveway, looking for the 4" drain pipe that's not draining properly. Once we find it, we'll tap into it and add another outlet line running down the ditch.
     
 
Installing the last roof panel! For this one, we moved the forklift around to the end of the roof so the guys didn't have to walk on the lower panel.
Our roof is completely paneled! The only thing that's left is the ridge cap.
<-- BACK TO CONSTRUCTION (FLOOR & ROOF)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s