Stephen throwing pieces of wood into puddles...in the rain. |
|
Paul and Jeff watch something going on across the road while they wait for Jillena to lift the next panel. |
For the panel rack to extend up the roof a little so the guys can pull the panels off, Jillena needs to get the rack above the roof line before moving forward. |
|
Watching for hand signals from the guys on the roof to get the rack at the right position next to the roof edge. |
Sliding the panel off the rack. |
|
The overlap is about 7 inches, and every lap joint is sealed with butyl tape. |
After driving back and forth a few times on the same damp soil, the forklift formed some deep ruts. Paul hopped into the dozer and leveled the area, then it was back to lifting a few more panels. |
|
What it looks like from Paul and Jeff's vantage point after they take a panel off the forklift rack. |