8-29-09
 
 
Stephen throwing pieces of wood into puddles...in the rain.
Paul and Jeff watch something going on across the road while they wait for Jillena to lift the next panel.
     
 
For the panel rack to extend up the roof a little so the guys can pull the panels off, Jillena needs to get the rack above the roof line before moving forward.
Watching for hand signals from the guys on the roof to get the rack at the right position next to the roof edge.
     
 
Sliding the panel off the rack.
The overlap is about 7 inches, and every lap joint is sealed with butyl tape.
     
 
After driving back and forth a few times on the same damp soil, the forklift formed some deep ruts. Paul hopped into the dozer and leveled the area, then it was back to lifting a few more panels.
What it looks like from Paul and Jeff's vantage point after they take a panel off the forklift rack.
<-- BACK TO CONSTRUCTION (FLOOR & ROOF)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s