11-19-07
 
 
 
A rear-mounted crane on the back of the form truck begins lifting off the steel form bundles for the walls.
 
Before the forms for the walls can go up, the wooden footer forms get taken off.
     
 
Another form bundle comes off the truck.
 
The bundles got placed around the perimeter.
     
 
The rebar for the walls gets laid out on the ground first before attaching to the footer rebar pins.
 
The stone slinger backing into position to spread more crushed stone inside the perimeter of the house.
     
 
Fastening the rebar for the rear footers to the rebar pins in the double frost wall.
 
The guy in the red hat operated every movement of the stone slinger by wireless remote control, including the truck itself!
     
 
Workers spread the stone so that it comes up level with the top of the footers.
 
Installing the forms for the footers on the double frost wall which will support the rear patio concrete slab.
     
 
Working on the front of the two slab footers.
 
All ready to pour concrete in these forms.
<-- BACK TO CONSTRUCTION (PHASE 2) PAGE  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.