Back to Fall 2010 Projects
Click TOOLS OF THE TRADE to see some of the tools and equipment we used.
Click CREDITS to see the major companies and suppliers we've worked with.
 

9-24-10

While Bob and Jillena work above defuzzing, Jeff cut out the front door opening and worked on carving the sill log down.

No additional pics for today.

     
 

9-25-10

Jeff spent most of the day working on the front door opening again.

click here for more pics

     
 

10-3-10

With the sill log cut pretty much down to where the door frame needs to sit, Jeff began on the header log. Of all the header logs he's had to cut for the windows and doors, this is the last one! Mike and Billie Jo joined us for part of the day and worked on stuffing insulation in the west wall.

click here for more pics

     
 

10-17-10

Jeff resized the front door opening a little more because the frame was fitting a little too tightly. It's still snug, but it might just work. He also painted the caulking along the edge of the soffit paneling he put up two days ago and installed drip caps to most of the windows on the back wall.

no additional pics for today

     
 

11-14-10

Jillena sanded and put another coat of stain on some of the door panels, then headed upstairs to stuff batting in the walls.

no additional pics for today

     
 

12-03-10

Jillena worked on the doors this evening after our first day of milling logs on site. Jeff also wrapped up the basement insulation project tonight.

no additional pics for today

     
Back to Fall 2010 Projects

BACK TO OUR LOG HOME PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.